Old residential projects in Lithuania — typical panel or brick apartment blocks built in the Soviet and post-war periods — have their own challenges when replacing windows. Choosing the right profile, glazing unit, and installation method reduces heat loss, improves sound insulation, and prevents condensation issues.
Usually no permit is required for interior replacement unless you alter the facade, change the opening size, or the building is protected as a heritage monument — then approval is needed.
Typical lead time: 2–4 weeks for standard units. Custom sizes, laminations, or special glazing increase lead time to 4–8 weeks.
Use warm installation with vapor and waterproofing tapes, proper foam sealing, and place the mounting plane to minimize exposure.
At least 5 years for profiles and hardware, 2–5 years for glass units. Installation warranty should be separate (minimum 2 years recommended).